Flos

Catálogo Architectural 2010 Página 347

Ver descripción

?CARRILES TRIFASICOS THREE PHASE TRACK INSTRUCCIONES PARA LA INSTALACION DE LOS CARRILES TRIFASICOS (3P+N+PE) Un 400V, In 16A. 50Hz, Clase I, IP 20 INSTALLATION INSTRUCTIONS FOR THE THREE-PHASE TRACKS 32,5 32,5 31,5 La posicion lateral del conductor neutro se indica por una linea larga. The position of the neutral lead is shown by the thick line. 56 La posicion del conductor neutro viene indicada por una linea larga. The position of the neutral lead is shown by the thick line. 66 L 66 L 100 66 100 60.3039 60.3101 L=1000 60.3102 L=2000 60.3043 60.3044 60.3049* 60.3051* 60o-300o 60.3092 60.3038 60.3016 60.3028* 60.3029* 0o-360o 60.3037 L=175 60.3039 60.3810 L=1000 60.3820 L=2000 60.3830 L=3000 60.3840 L=4000 60.3053 66 346 60.3036* 60.3103 L=3000 60.3104 L=4000 60.3047* 60.3048* 90o 180o 270o 60.3046 L=160 * Puede ser usado como punto de alimentacion./Can be used as a power supply point. CORTE DE LOS RAILES A MEDIDA 60.3053 CUTTING TRACK 1 . CORTE DEL RAIL 1 . CUTTING THE TRACK 60.3054 2 . POSICIONE LA LLAVE DE MANIPULACION DEL RAIL 2 . POSITIONING BENDING KEY IN THE TRACK 3 . PLIEGUE DE LOS CONDUCTORES 3 . LEAD BENDING 4 . CONDUCTORES PLEGADOS 4 . BENT LEADS 5 . CONTROL DEL PLIEGUE DE LOS CONDUCTORES 5 . BENT LEADS CONTROL 90o 180o 270o 60.3091 60.3091 60.3091 60.3091

Página 347 / 374

  • 100% productos originales
  • Paga con tarjeta de crédito
  • Paga con tarjeta de crédito
  • Pago con Stripe
  • Pago por transferencia bancaria
  • Envíos seguros (Seguro de transporte)
  • 2 años de garantía

Añadiendo productos al carrito